Drone battery packs · North Carolina

6S lithium-ion packs for drones, built and checked by hand.

Tarwing assembles 6S3P 21700 packs for US drone makers: matched cells, copper busbars, a written test record for every pack, and paperwork showing where every cell was made.

Finished 6S3P pack in blue PVC heat shrink, with an XT90 discharge lead and a JST-XH balance lead. Label: 21.6 V nominal, 25.2 V full, 12 Ah, about 259 Wh.
21.6 Vnominal, 25.2 V full (6S)
12–15 Ahthree 21700 cells per group
259–324 Whdepending on the cell
XT90 + JST-XHdischarge and 7-pin balance leads
See it built

One pack, start to finish, in 66 seconds

An animation of our 6S3P build: cell matching, insulation, welding, wiring, testing and wrapping. Pick a step to jump to it.

Packs

Start with a 6S3P. Ask for your own spec.

Our first designs are 6S3P packs on two named 21700 cells. If your airframe needs a different series count, capacity, connector or shape, send us the spec.

Higher energy

6S3P · Molicel P50B

For long-endurance multirotors and fixed-wing aircraft. Cells made in Taiwan by Molicel.

Configuration
6S3P, 18 cells
Voltage
21.6 V nom / 25.2 V max
Capacity
15 Ah
Energy
≈ 324 Wh
Leads
XT90, JST-XH 7-pin
Reference build

6S3P · EVE INR21700-40P

The build shown in the video and the step-by-step guide on this page.

Configuration
6S3P, 18 cells
Voltage
21.6 V nom / 25.2 V max
Capacity
12 Ah
Energy
≈ 259 Wh
Leads
XT90, JST-XH 7-pin
Built to order

Custom and BMS versions

Different series or parallel counts, connectors above 90 A, custom shapes, and packs with a battery management system (BMS). We can also qualify a second cell, such as one from a US-owned maker, to suit your sourcing rules.

Wire
10 AWG, or 8 AWG for 120–150 A
Busbar
Cu + Ni sandwich
Lead time
Quoted per order
How we build

Ten steps, every pack, written down

This is our build sheet for the 6S3P. Each pack goes through the same steps and checks, and the readings are kept with its serial number. Click an image to see it full size.

Step 1: 18 cells, each tagged with its voltage between 3.70 and 3.72 V, and a multimeter reading 3.71 V.
STEP 1

Check and match all 18 cell voltages

Every cell is measured before anything is connected. All 18 must be within 0.02 V of each other, ideally around 3.6–3.8 V storage voltage.

Cells at different voltages dump a large, uncontrolled current into each other once they are paralleled.

Step 2A: a self-adhesive fish-paper ring being placed on the positive end of a 21700 cell.
STEP 2A

Fish-paper ring on every positive terminal

The shoulder next to the + button is the cell's negative can. A ring on all 18 positive ends means a strip, weld or burr can't short the cell.

Step 2B: 18 cells in six groups of three, alternating plus-up and minus-up, with fish-paper sheets between groups.
STEP 2B

Six groups of three, alternating orientation

The three cells in each group face the same way; neighbouring groups alternate, so every series link is a short bridge. Fish paper goes between groups so the wraps can't rub through.

Step 3A: copper and nickel strips welded across each group of three, top and bottom views.
STEP 3A

Weld the parallel strips, top and bottom

Twelve strips, one across each group on both ends. Copper 0.15–0.2 mm under 0.1 mm nickel (sandwich weld), or 0.2–0.3 mm pure nickel.

No nickel-plated steel strip on its own: at these currents it overheats.

Step 3B: H-shaped series links joining groups, with landing tabs for B− and B+ and pre-tinned balance tabs.
STEP 3B

Series links, landing tabs and balance tabs

Three links on top (G1–G2, G3–G4, G5–G6) and two underneath (G2–G3, G4–G5). G1− becomes the pack negative and G6+ the pack positive, both on landing tabs.

Tabs are pre-tinned before welding, so no soldering heat goes into a cell.

Step 4A: black 10 AWG lead soldered to the B− tab, red 10 AWG lead routed along the side from B+, ending in an XT90 connector.
STEP 4A

Main leads and the XT90

10 AWG high-temperature silicone wire for 80–120 A builds, 8 AWG for 120–150 A, soldered with an 80–100 W+ iron on the tab, never on a cell.

The connector is sized to the current: an XT90 is rated about 90 A continuous; above that we fit a bigger one.

Step 4B: seven balance wires from a JST-XH connector to B−, each series link and B+, labelled 0 V to 22.2 V.
STEP 4B

JST-XH 7-pin balance lead

Pin 1 is B−, pin 7 is B+, and each middle pin goes to one series link: 0, 3.7, 7.4 … 22.2 V. Wired by pin order, not wire colour.

Step 5A: multimeter probes on adjacent pins of the balance plug, reading 3.71 V.
STEP 5A

Verify every group before wrapping

Each adjacent pin pair reads 3.6–3.8 V and all six agree within a few hundredths of a volt. Pin 1 to pin 7 reads six times the cell voltage.

A pair at 0 V or about 7.4 V means a balance wire is on the wrong junction; it is fixed before insulating.

Step 5B: exploded view showing fish paper over the busbars and foam impact pads on both ends.
STEP 5B

Insulate and pad

Fish paper and Kapton tape over every busbar, tab and joint, top and bottom. Foam impact pads on both ends, and the leads supported so their weight isn't on the solder joints.

Step 5C: the finished pack in PVC heat shrink, with its label, XT90 and balance leads.
STEP 5C

Shrink-wrap and first plug-in

PVC heat shrink, worked from the middle out. First plug-in goes through a smoke stopper or a current-limited supply, then a balanced 6S charge to 25.2 V, never left unattended.

Checks on every pack

What we measure, and the limits we hold

±0.02 V

Maximum voltage spread across all 18 cells before assembly.

6 / 6

Balance-plug pairs checked at 3.6–3.8 V, plus the full-pack reading, before insulation.

0 cells

Soldered directly. Heat goes into pre-tinned tabs only.

Cu + Ni

Copper busbars for low resistance at high current, instead of plated steel.

1st plug-in

Through a smoke stopper or current-limited supply, then a supervised balance charge.

Per cell

Maker, model and lot recorded, with the cell maker's UN38.3 test summary on file.

Shipping and paperwork

Shipped the legal way, by ground

A 6S3P pack holds 259–324 Wh, well over the 100 Wh line, so it ships as Class 9 dangerous goods. Here is how we handle that.

  • UN38.3 testing for each designEvery pack design goes through UN38.3 at an independent lab before we ship it in volume. We'll share the test summary once it's issued.
  • Evaluation samples before UN38.3Until a design's report is issued, we ship small numbers under DOT's low-production and prototype provisions (49 CFR 173.185(e)): up to 100 packs a year per design, by ground, each in its own inner packaging with non-conductive cushioning.
  • Ground onlyWe don't ship lithium-ion packs by air. Plan your lead times around ground transit.
  • Trained hazmat shipperWhoever packs, marks and signs for a shipment holds current DOT hazmat training (49 CFR 172.704).
  • Cell origin you can checkEach pack comes with the cell maker, model and country of manufacture, and the cell maker's UN38.3 report. We only make sourcing claims we can back with documents.

Launch timeline

  1. Dec 2026
    Evaluation samplesFirst builds for drone makers to test on their airframes.
  2. Jan 2027
    First paid ordersSmall runs under the low-production provision, shipped by ground.
  3. Feb – Mar 2027
    UN38.3 report expected16 sample packs tested at an independent lab, about 4–6 weeks.
  4. From Mar 2027
    Volume shipmentsNormal Class 9 ground shipping once the report is issued.

Dates are plans, not promises. We'll tell you where your order stands, including the testing status of the design you're buying.

Talk to us

Request samples or a quote

Tell us about your aircraft and the pack you need. We reply within two business days.

Or email [email protected].

We use your details only to answer this request.

FAQ

Questions buyers ask

Are your packs NDAA compliant?

We don't put a blanket "NDAA compliant" label on a pack. We tell you exactly which cell maker and factory country is inside, with the documents to prove it, so your compliance team can make the call against the rule that applies to your contract.

Do the packs have a BMS?

The standard 6S3P is a balance-lead pack without a BMS, like most drone packs; your charger balances it through the JST-XH lead. We build BMS versions on request.

Can you match our existing connector and shape?

Yes. Tell us the connector, wire length, maximum size and current, and we'll quote a custom layout. Above about 90 A continuous we fit a larger connector than the XT90.

Why can't you ship by air?

Packs this size are fully regulated dangerous goods. Ground shipping is simpler, cheaper and safer for everyone, so it's the only way we ship.

How should we charge and store them?

Charge as 6S to a maximum of 25.2 V with the balance lead connected, and never leave a pack charging unattended. For storage, keep packs around 3.6–3.8 V per cell in a fire-resistant container.

Where are you?

Tarwing LLC is a US-owned company in North Carolina. Tarwing also runs drone site-security services; see tarwing.pages.dev.